Technical context
Three pressure points on one specimen are not three independent specimens.
How to evaluate the evidence
Use multiple production lots, randomized order, repeated runs and a sealed blank to estimate fixture leakage.
Practical verification
Report uncertainty and raw time series, including failures and exclusions, before comparing brands.
What the evidence supports
Multiple lots, blank fixture tests, pressure-time records and uncertainty estimates are needed for population claims.
Inspection questions perspective
Ask the inspector which code edition applies, what listing is required and whether the proposed arrangement needs an open vent or additional approval.
Editorial conclusion
Multiple lots, blank fixture tests, pressure-time records and uncertainty estimates are needed for population claims. Treat this as an editorial interpretation, not a signed engineering opinion or independent product certification.
Source and verification
Supplied 2017 pressure differential reports (Lab 33972), custom protocol and conversation, and supplied installation, brand comparison and dual-seal articles. See evidence policy and data.